Reviewer flagged the load calc
The Manual J doesn't match the plan set, the equipment is oversized, or the method wasn't ACCA-compliant. Now it's a resubmittal cycle instead of an approval.
Send the architectural set. Get back a sealed load calculation and energy-code compliance report built to survive the reviewer's first pass — not to trigger the next round of comments.
The mechanical drawings can be perfect and the submittal still bounces on the load calc or the code-compliance form. If any of this is your project right now, here is the fast path through.
The Manual J doesn't match the plan set, the equipment is oversized, or the method wasn't ACCA-compliant. Now it's a resubmittal cycle instead of an approval.
COMcheck or ResCheck was never run, or it doesn't reconcile with the architectural envelope and mechanical schedule. It gets caught eventually — better before submittal than after.
Equipment changed, the envelope changed, or the layout shifted after the calc was done, and nobody re-ran the numbers. The permit set and the field no longer agree.
We reply within 1 business day with a fixed price and a turnaround date — no obligation.
Attach or describe the plan set. We'll tell you straight what it takes and by when.
Not a spreadsheet you have to reformat for the county. A finished, sealed submittal exhibit.
Room-by-room load calculation, equipment selection, and duct design — ACCA-compliant and matched to the plan set actually being permitted.
COMcheck (commercial) or ResCheck (residential) run against the current Florida Building Code energy chapter, reconciled with the envelope and mechanical schedule — not run in isolation.
Delivered as a sealed exhibit in the format your jurisdiction expects — ready to drop into the submittal set, not a raw software export.
A load-calc or energy-code comment sends the whole submittal back into the queue behind everyone else's revisions — not just the mechanical sheet. On a schedule-driven build, that delay is the expensive part, not the report.
Avidan supports GCs, design-builders, and design teams that need Manual J/S/D and Florida energy-code compliance handled by one accountable engineer of record — not a rework cycle away from a rejected permit.